Dongguan Decaide Hardware Co., Ltd.
Products
Contact Us
  • Contact Person : Ms. Li Mary
  • Company Name : Dongguan Decaide Hardware Co., Ltd.
  • Tel : 86--769-85337197
  • Fax : 86--769-85337198
  • Address : Guangdong,Dongguan,No.308 Xingyi Rd,Chenwu,Wusha Zone,Chang'an Town
  • Country/Region : China
  • Zip : 523858

New Stainless Steel Frame For LCD Monitor

New Stainless Steel Frame For LCD Monitor
Product Detailed
Related Categories:Frame
Stainless Steel Frame 1.Material:steel,stainless steel,aluminum 2.Finish:powder coating,etc 3.ISO9001,RoHS 4.OEM available

New Stainless Steel Frame For LCD Monitor

Item namestainless steel frame
Item noMetal frame-009
BrandDCD
Material availablestainless steel, steel, brass, aluminum, etc
Surface treatment

powder coating, spray paint, polishing, zinc/nickel plated,

silk sreening, etc

Demensioncustomized
Colorblack or customized
Typestainless steel frame
ApplicationLCD Monitor
CapabilityOEM, Own factory, Custom-made
CertificationISO9001:2008, RoHS
Guarantee365 Days
OEM serviceaccording to customer's drawings or samples

About us

We are a professional manufacturer of sheet metal parts, hardware stampings, hardware automatic lathes, CNC lathe parts, CNC turning parts and hardware nameplates and label plates. Our main products include sheet metal parts, sheet metal products, hardware stampings, metal case, metal enclosure, sheet metal cabinet and so on.

Equipment

We are equipped with 60 punches (6.3 T to 160 T), 60 automatic lathes and CNC lathes, 40 CNC universal spring forming machines, more than 20 mould unloading facilities, 100 secondary processing equipment and quality test equipment more than 300 sets in total.

OEM/ODM service offered

The picture just showed one of scope we cover. We are capable to manufacture sheet metal parts and hardware stampings according to customer's drawings or samples. We are insisting on providing top quality products with competitive price. Please feel free to contact us. Welcome your inquiry.

Terms and Conditions

stainless steel frame sample lead time:7-14 days

Production lead time:20-30 days

Payment term:30% prepaid before production, the balance should be paid before shipment.

                      other payment terms can be discussed.

Shipping term:Exw, FOB, CIF or other shipping terms can be discussed.

How to place an order

1.You send us your drawings or sample

2.We provide you an exact quote

3.When confirming our price, we prepare the first article

4.After confirming our sample, you place an order

5.Begin mass production after receiving 30% down payment.

6.Deliver the goods after receiving the balance.

Notes

All the pictures showed on the sites are just for your reference, not for sale. Welcome your drawings and samples.

 

New Stainless Steel Frame For LCD Monitor



Copyright Notice @ 2008-2022 ECBAY Limited and/or its subsidiaries and licensors. All rights reserved.